BS EN 12350-1 PDF

Buy BS EN TESTING FRESH CONCRETE – PART 1: SAMPLING from SAI Global. said in BS EN , take a few samples throughout the pour for the best representation of the batch and make sure you take % of what you think you’ll . This British Standard specifies two procedures for sampling fresh concrete which are implemented by composite sampling and by spot.

Author: Vuran Zolole
Country: Chad
Language: English (Spanish)
Genre: Photos
Published (Last): 27 September 2006
Pages: 159
PDF File Size: 17.1 Mb
ePub File Size: 15.84 Mb
ISBN: 818-6-48211-888-7
Downloads: 41322
Price: Free* [*Free Regsitration Required]
Uploader: Yozshurg

Your basket is empty. When mixing and sampling of concrete is done in a laboratory, different procedures may be required. Bw most common method used in the sampling for casting with large volume of concrete is the spot sampling which is less time intensive due to the rate of pouring.

Significance and Use The slump test was originally developed to provide a technique to monitor the consistency of unhardened concrete. Please download Chrome or Firefox or view 123501- browser tips.

Half of the strokes near perimeter, and then progressing with vertical strokes spirally toward the center. This site uses cookies. Fill in your details below or click an icon to log in: Record the date and time of sampling.

Do not remove bbs device from the concrete when reading the temperature. Concrete having coarse aggregate up to 40 mm in size. Proceed to Checkout Continue Shopping. The place else may anybody get that type of info in such a perfect means of writing?

Again there may be more recent versions of the document. Protect the sample from the sun, wind, and other sources of rapid evaporation, and from contamination.

This test is considered applicable to: Sampling of fresh concrete at site. Standards Subscriptions from ANSI provides a money-saving, multi-user solution for accessing standards.

  ANATOL ROSENFELD TEXTO CONTEXTO PDF

Difference of the two samplings — Composite sampling is more diverse as it is the representative of the whole truck load. Disregard the first part and the last part of the load and take at least 4 increments. Sampling Concrete It is acceptable to measure the temperature in: Compaction of the concrete The concrete shall be compacted immediately after placing in the moulds in such a way as to produce full compaction of the concrete with neither excessive segregation nor laitance.

You can download and 123501 this file to your own computer but DRM prevents opening this file on another computer, including a networked server. Transport of test specimens Avoid loss of moisture and deviations from the required temperature at all stages of transport.

Mechanical vibration using Compacting with an internal vibrator Apply the vibration for the minimum duration necessary to achieve full compaction of the concrete.

BS EN 12350-1/BS EN 12350-2/BS EN 12390-2/BS EN 12390-2

Extended delays in placing can lead to a significant loss of 13250-1 with time making it impossible to place with satisfactory compaction. Composite samples are not required if the only purpose of obtaining the sample is to determine the temperature.

Avoid over-vibration, which may cause loss of entrained air.

In the case 122350-1 self-compacting concrete, the mould shall be filled in one operation and no mechanical compaction shall be applied during filling or after the mould is filled.

Standards Subsctiption may be the perfect solution. Search all products by. Pack the hardened test specimens in wet sand or wet sawdust or wet cloths wet burlapor sealed in plastic bags containing water.

Please first verify your email before subscribing to alerts. After this, the design mix specific to the particular type of structure recommends the discharge time limit waived against what is stated in the specifications.

  EXAM 70-687 CONFIGURING WINDOWS 8 LAB MANUAL PDF

BS EN – Testing fresh concrete. Sampling – BSI British Standards

Ensure that the compacting rod, or bar, does not forcibly strike the bottom of the mould ne compacting the first layer, nor penetrate significantly any previous layer.

The Location of concrete represented The Time of casting Compacting Methods Internal Vibrators that will be used should have the following specs: I have a presentation subsequent week, and I am on the look for such info. Full compaction is achieved using mechanical vibration, when there no further appearance of large air bubbles on the surface of the concrete and the surface becomes relatively smooth with a glazed appearance, without excessive segregation.

Apparatus Container, large enough to provide at least 75 mm of concrete in all directions around the sensor of the temperature measuring device, or at least three times the NMAS Nominal Maximum Aggregate Sizewhichever is 12350.

Their committees work with the manufacturing and service industries, government, businesses and consumers to facilitate the production of British, European and International standards. Compacting by hand with compacting rod or bar Distribute the strokes in a uniform manner over the cross-section of the mould. Take the smart route to manage medical device compliance. Learn more about the cookies we use and how to change your settings.

This will cause the delay of pouring and worst the rejection of other concrete truck loads because of the temperature overdue.