ASTM F2170 STANDARD TEST METHOD PDF

ASTM F formally recognizes the use of in situ probes as a means of conducting relative humidity testing. In fact The Standard The In-Situ Method In-situ concrete moisture testing places sensors, or probes, inside the slab itself . This test method covers the quantitative determination of percent relative testing. The ASTM F standard represents a fundamental change in how. This standard is issued under the fixed designation F; the number immediately 1 This test method is under the jurisdiction of ASTM Committee F06 on.

Author: Gorn Dura
Country: Senegal
Language: English (Spanish)
Genre: Business
Published (Last): 15 January 2014
Pages: 456
PDF File Size: 13.99 Mb
ePub File Size: 14.25 Mb
ISBN: 383-8-27024-580-1
Downloads: 75772
Price: Free* [*Free Regsitration Required]
Uploader: Fenrigal

As concrete dries, moisture migrates from the bottom of the slab to the surface where it can evaporate away. June 9, at 1: Preparation Confirm your test method equipment meets specifications.

10 Guidelines for ASTM F2170 Preparation and Testing

Many contractors use vapor barriers directly under the slab to slow moisture permeation. After the initial reading, readings can be updated at any time desired with two conditions in mind: Is this acceptable or compromise the test? At this point, if one test fails, they all fail.

Standarr, I have to state that F is specified for interior applications that are under consistent ambient air controls. Know the required depth of the test holes. Skip to content Concrete slab moisture is a major cause of concrete flooring failure.

Learn how your comment data is processed. In this way, in situ measurement provides a composite picture of overall slab moisture levels, and provides the data necessary to make business decisions regarding flooring installations. This process requires time and quantifiable concrete moisture measurements to verify. This website uses cookies.

Public Knowledge Base

Sub-grade water vapor can permeate even well-mixed and applied slabs. The first thing I would look at is the assembly that you are installing. Make tst your calibration is up to date. The standrd provides precise guidelines for RH testing methods. When concrete is mixed and poured, water vapor migrates from the bottom of the slab to the surface to evaporate.

  BOGE CL5 PDF

First, as you probably know, the ASTM standard is silent on this specific topic.

ASTM F Explained – ASTM F Information

In-situ concrete moisture testing places sensors, or probes, inside the slab itself. Reusable sensors should be calibrated by the manufacturer at least once per year, or more often if exposed to conditions that may impact their accuracy.

You consent to our cookies if you continue to use our website.

Surface-based test results will fluctuate, even more, under these changes in environmental conditions. Relative humidity RH in a concrete slab can fluctuate with trst changes. If you forward to 1: April 3, at How do you handle this problem?

The depth is calculated to the bottom of the test hole the location of the installed RH sensor or probe. Can you please let me know your recommendation on this? In celebration of the New Year, we will be closing early at In situ moisture measurement systems are evolving rapidly as a result of ATSM F and reflect the industry realities of the concrete installation business.

I would meghod that the hole depths are consistent and that environmental conditions are at service conditions. Section 9 of the standard requires that both the slab and the ambient air above it must be at service conditions for a minimum of 48 hours before testing. Each test hole must be drilled to the depth determined at Step 5 above section 10 of ASTM F and properly prepared. October 31, at Note that the liner requirements have been updated and the hole is to be fully lined to meet the ASTM standard.

These requirements for the standard apply regardless of the RH test method being used. We use cookies for shopping cart functionality, to personalize content and ads, to provide social media features and to asrm our traffic. Jason, I appreciate this means to contact you.

  ENERGOELEKTRONIKA WSIP PDF

In that case, builders did not allow the slab sufficient time for concrete moisture levels to equilibrate reach equilibrium moisture content according to relative humidity RH.

It has been believed that the change in the desiccant weight could be translated into a moisture ratio for the concrete beneath. Leave a Reply Cancel reply Your email address will not be published. Concrete slab moisture axtm a major cause of concrete flooring failure. We also will not be shipping on these days, but will resume shipping on Tuesday, January 2nd. If i have an area of approx sq ft and have done the required testing for the area, and 5 fail and 3 pass does the whole area fail?

UPS peak season may cause delays. Without it, even a well-dried and functioning foundation can end up with concrete slab moisture problems. Concrete absorbs water standarr from the air under high ambient humidity; concrete releases more water vapor when the humidity of the surrounding air is low. Each hole must have a liner that isolates the sensor from ambient conditions, and sensors must have Methoe calibration. Contact My Account 0 items December 27, jethod 3: Meeting this standard provides the groundwork for limiting moisture-related flooring problems and the many liabilities and mitigation problems that can result from excess moisture.

All sensors must be calibrated no less than 30 days prior to use. For most RH testing systems, this includes cleaning any debris out of the test hole and inserting the necessary liner in the hole.